CVD System consists of tube furnace,gas supply system and vacuum unit.
|
Split vacuum tube furnace
BTF-1200C
|
BTF-1200c can supply vacuum&atmosphere protection environment .
It is easy to installation and dispatch.From the transparent quartz chamber,the state of sintering can be observed.
Pneumatic spring structure make the operator easy to open it.
|
|
Tube size
|
Φ50 ×1000mm(tube size can be optional)
|
Heating element
|
Fe-Cr-Alloy adopted by Mo
|
Zone length
|
Heating :440mm Constant:200mm
|
Temperature controller
|
*30 programmable segments for precise control of heating rate ,cooling rate and dwell time.
*Built in PID automatic tune function with overheating&brocken thermocouple brocken protection and over temperature protection and alarm allows for operation without attendants.
|
Accuracy
|
±1℃
|
Suggest heating rate
|
15℃/min
|
Standard accessories
|
quartz tube 1 pcs,stainless steel sealing flange 1set,silicon sealing ring 2set,high temperature glove1pair,quartz block1 pc.
|
Gas-supply system 3 channels MFC,GMF-3Z
|
Connector style
|
Double cutting ferrule stainless steel connector
|
Standard range(N2)
|
50sccm、100sccm、200sccm(optional)
|
Accuracy
|
±1.5%FS
|
Linearity
|
±0.5~1.5%
|
Working pressure range
|
0.1~0.5 MPa
|
Max.pressure
|
3MPa
|
Connector
|
Φ6,1/4''
|
Display
|
LCD touch screen 3 figrues show
|
Working tem. environment
|
5~45 High purity gas
|
Pressure vacuum gauge
|
-0.1~0.15 MPa(0.01 MPa/grid)
|
Inter&exter Parabolic ss pipe
|
Φ6
|
Low vacuum unit,Vau-02
|
Relative air humidity
|
≤85%
|
Working voltage
|
220V±10% 50~60HZ
|
Air bleed rate
|
8m³/h
|
Experiment vacuum
|
1.0X10-1Pa
|
Oil capacity
|
1.1L
|
Inlet/Outlet caliber
|
KF25
|
Rotation rate
|
1450rpm
|
Noise
|
50dB
|